C.R.S. Section 38-4-110
No right to vein matter acquired


Nothing in this article shall be so construed as to give such tunnel corporation the right to follow any vein or lode without the consent of the owner. When any vein or lode is encountered in driving any such tunnel, such tunnel corporation shall only have the right-of-way to cross such vein or lode at such angle as may be suitable for the convenient operation of the tunnel.

Source: Section 38-4-110 — No right to vein matter acquired, https://leg.­colorado.­gov/sites/default/files/images/olls/crs2023-title-38.­pdf (accessed Oct. 20, 2023).

Green check means up to date. Up to date

Current through Fall 2024

§ 38-4-110’s source at colorado​.gov