C.R.S. Section 40-3.2-104.4
Colorado energy office gas investment asset depreciation study

  • third-party evaluation
  • commission rules

(1)

Intentionally left blank —Ed.

(a)

On or before July 1, 2024, the Colorado energy office created in section 24-38.5-101 (1) shall contract with an independent third party to evaluate the risk of stranded or underutilized natural gas infrastructure investments and the annual projected rate impact on ratepayers.

(b)

The evaluation must take into account:

(I)

Any projected decline in gas sales;

(II)

The decline in the number of gas customers; and

(III)

Measures to achieve the greenhouse gas emission reduction goals set forth in section 25-7-102 (2)(g).

(c)

The independent third party shall conduct an analysis of, and include policy recommendations related to, the potential impacts of stranded or underutilized natural gas infrastructure on utility employees who work for, or contract workers who perform work for, investor-owned gas utilities. In conducting the study, the independent third party shall consult with appropriate labor organizations that represent utility employees who work for, and contract workers who perform work for, investor-owned gas utilities and other relevant stakeholders.

(2)

After the independent third-party evaluation described in subsection (1) of this section is completed, the Colorado energy office shall submit a written copy of the findings and conclusions of the evaluation to the commission. The commission shall review the evaluation and consider whether any changes to rules or depreciation schedules are warranted.

(3)

Intentionally left blank —Ed.

(a)

An investor-owned gas utility shall provide as part of any gas infrastructure plan, or as otherwise directed by the commission, a map showing system-wide locations, ages, and materials or types of gas distribution system pipes, consistent with 49 CFR 191 and section 40-2-115 (1)(d).

(b)

As part of the filing, the investor-owned gas utility shall also provide information about pipes that may need to be upgraded or replaced within ten years after the date that the utility files the plan, unless otherwise directed by the commission.

(c)

The commission shall ensure that the content of the map provided to the commission and sharing procedures are in compliance with the parameters related to critical infrastructure reporting standards of the California Institute for Energy and Environment, or its successor organization, and the safety and system integrity standards of the American Petroleum Institute, or its successor organization.

(d)

Intentionally left blank —Ed.

(I)

An investor-owned gas utility may designate any map or associated information provided pursuant to this subsection (3) as containing critical infrastructure information. If the commission determines that the designated map or associated information does not contain critical infrastructure information, the investor-owned gas utility may appeal the commission’s determination in a court of competent jurisdiction by filing the appeal within ten days after the commission’s determination.

(II)

If the commission determines that the disclosure of the designated map or associated information may expose or create vulnerability to critical infrastructure facilities or systems, the commission:

(A)

Shall limit access to the designated map or associated information to individuals at state agencies that are parties to the proceeding in which the map or associated information was provided; and

(B)

Except as provided in subsection (3)(d)(II)(A) of this section, shall not provide the designated map or associated information to any persons and may order the investor-owned gas utility to provide a public redacted version of the map or associated information that includes a general description of the information without detailed location information.

(III)

A custodian, as defined in section 24-72-202 (1.1), shall not release a map or associated information for which the commission has limited access pursuant to subsection (3)(d)(II) of this section in response to any request to inspect public records pursuant to the “Colorado Open Records Act”, part 2 of article 72 of title 24.

Source: Section 40-3.2-104.4 — Colorado energy office gas investment asset depreciation study - third-party evaluation - commission rules, https://leg.­colorado.­gov/sites/default/files/images/olls/crs2023-title-40.­pdf (accessed Oct. 20, 2023).

40‑3.2‑101
Legislative declaration
40‑3.2‑102
Recovery of air quality improvement costs
40‑3.2‑103
Gas distribution utility demand-side management programs - recovery of costs - reports
40‑3.2‑104
Electricity utility demand-side management programs - rules - annual report - definition
40‑3.2‑104.3
Eliminating incentives for gas service to properties - gas line extension allowances - exemptions - definitions
40‑3.2‑104.4
Colorado energy office gas investment asset depreciation study - third-party evaluation - commission rules
40‑3.2‑104.5
Customer disconnection from investor-owned gas utility service - rules
40‑3.2‑104.6
Commission study on beneficial electrification - repeal
40‑3.2‑105.5
Labor standards for gas DSM projects
40‑3.2‑105.6
Labor standards for beneficial electrification projects
40‑3.2‑105.7
Labor standards for state thermal energy network and thermal energy system projects - definitions
40‑3.2‑106
Costs of pollution in utility planning - rules
40‑3.2‑107
Costs of methane pollution in gas DSM program planning - rules - definitions
40‑3.2‑108
Clean heat targets - legislative declaration - definitions - plans - rules - reports
40‑3.2‑109
Beneficial electrification plans for electric utilities - definition - rules - recovery of costs - report
40‑3.2‑201
Short title
40‑3.2‑202
Legislative declaration
40‑3.2‑203
Definitions
40‑3.2‑204
Emission control plans - role of the department of public health and environment - timing of emission reductions - approval
40‑3.2‑205
Review - approval
40‑3.2‑206
Coal plant retirements - replacement resources
40‑3.2‑207
Cost recovery - legislative declaration
40‑3.2‑208
Air quality planning
40‑3.2‑209
Early reductions
40‑3.2‑210
Exemption from limits on voluntary emission reductions
Green check means up to date. Up to date

Current through Fall 2024

§ 40-3.2-104.4’s source at colorado​.gov