C.R.S. Section 25-7-115
Enforcement

  • civil actions
  • definitions

(1)

Intentionally left blank —Ed.

(a)

The division shall enforce compliance with the emission control regulations of the commission, the requirements of the state implementation plan, and the provisions of parts 1 to 4 and part 11 of this article, including terms and conditions of any permit required pursuant to this article.

(b)

The division shall enforce the provisions of part 5 of this article pursuant to sections 25-7-112, 25-7-113, and 25-7-511.

(2)

Intentionally left blank —Ed.

(a)

If a written complaint is filed with the division alleging that, or if the division itself has cause to believe that, any person is violating or failing to comply with any rule of the commission issued pursuant to parts 1 to 4 of this article 7, order issued pursuant to section 25-7-118, requirement of the state implementation plan, or provision of parts 1 to 4 of this article 7, including any term or condition of a permit required pursuant to this article 7, the division shall cause a prompt and diligent investigation to be made unless:

(I)

The complaint clearly appears on its face to be frivolous, falsified, or trivial; or

(II)

The complainant withdraws the complaint within the time allotted for the complaint to be investigated.

(b)

Within thirty days after receipt of a complaint filed pursuant to subsection (2)(a) of this section, the division shall respond to a complainant to outline the steps of the complaint investigation.

(c)

Intentionally left blank —Ed.

(I)

If the division investigation determines that any violation or failure to comply exists, the division shall act expeditiously and within the period prescribed by law to formally notify the owner or operator of the air pollution source after the discovery of the alleged violation or noncompliance. The notice must specify the provision alleged to have been violated or not complied with and the facts alleged to constitute the violation or noncompliance.

(II)

If the division is acting in response to a complaint, the division shall notify the complainant that an investigation has commenced at the time that the division provides notice to the owner or operator of the air pollution source pursuant to subsection (2)(c)(I) of this section.

(d)

The division shall accept and consider all relevant evidence it receives or acquires in investigating and determining whether a violation or noncompliance occurred, including audio, video, and testimonial evidence, unless the evidence is, on its face, falsified.

(3)

Intentionally left blank —Ed.

(a)

Within thirty calendar days after notice has been given, the division shall confer with the owner or operator of the source to determine whether a violation or noncompliance did or did not occur and, if such violation or noncompliance occurred, whether a noncompliance penalty must be assessed under subsection (5) of this section. The division shall provide an opportunity to the owner or operator at such conference, and may provide further opportunity thereafter, to submit data, views, and arguments concerning the alleged violation or noncompliance or the assessment of any noncompliance penalty.

(b)

Intentionally left blank —Ed.

(I)

If, after the conference pursuant to subsection (3)(a) of this section, the division determines that a violation or noncompliance has occurred, the division shall issue an order requiring the owner or operator or any other responsible person to comply.

(II)

If a complaint is filed pursuant to subsection (2)(a) of this section alleging the violation or noncompliance, the division shall send the order to the complainant.

(III)

The order may:

(A)

Include the termination, alteration, or revocation and reissuance of the subject permit;

(B)

Include the assessment of civil penalties in accordance with section 25-7-122 and subsection (3)(b)(IV) of this section;

(C)

In addition to civil penalties, include a requirement to perform one or more projects to mitigate violations related to excess emissions; and

(D)

Require the calculation of a noncompliance penalty under subsection (5) of this section.

(IV)

In determining the amount to assess for a civil penalty for a violation or noncompliance, the division shall:

(A)

Consider the factors described in section 25-7-122 (2)(a); and

(B)

Not assess a penalty for a violation or noncompliance that is less than the economic benefit that the owner or operator derived from the violation or noncompliance.

(V)

Unless enforcement of its order has been stayed as provided in subsection (4)(b) of this section, the division may seek enforcement, in the district court for the district where the affected air pollution source is located, of:

(A)

Pursuant to section 25-7-121 or 25-7-122, an applicable rule of the commission;

(B)

An order issued pursuant to section 25-7-121 or 25-7-122 or the applicable rule of the commission;

(C)

An order issued pursuant to section 25-7-118;

(D)

A requirement of the state implementation plan;

(E)

A provision of this article 7; or

(F)

The terms or conditions of a permit required pursuant to this article 7.

(VI)

The court shall issue an appropriate order, which may include a schedule for compliance by the owner or operator of the source.

(c)

The order for compliance shall set forth with specificity the final determination of the division regarding the nature and extent of the violation or noncompliance by the named persons and facilities and shall also include, by reference, a summary of the proceedings at the conference held after the notice of violation and an evaluation of the evidence considered by the division in reaching its final determinations. Any order issued under this subsection (3) which is not reviewed by the commission in accordance with the provisions of subsection (4) of this section shall become final agency action.
(4)(a)(I) Within twenty calendar days after receipt of an order issued pursuant to subsection (3) of this section, the recipient thereof may file with the commission a written petition requesting a hearing to determine all or any of the following:

(A)

Whether the alleged violation or noncompliance exists or did exist;

(B)

Whether a revision of the state implementation plan or revision of a regulation or standard which is not part of the state implementation plan should be implemented with respect to such violation or noncompliance;

(C)

Whether the owner or operator is subject to civil or noncompliance penalties under subsection (5) of this section.

(II)

Such hearing shall allow the parties to present evidence and argument on all issues and to conduct cross-examination required for full disclosure of the facts and shall otherwise be conducted in accordance with section 25-7-119.

(III)

If a hearing is requested pursuant to subsection (4)(a)(I) of this section, the commission shall provide at least forty-five days’ notice to any complainant that filed a complaint pursuant to subsection (2)(a) of this section alleging a violation or noncompliance at issue in the hearing. The complainant may participate as a party to the hearing.

(b)

Except with respect to actions taken pursuant to section 25-7-112 or 25-7-113, upon the filing of such petition, the order and the provisions of the state implementation plan which relate to the alleged violation or noncompliance shall be stayed pending determination of the petition by the commission. Any stay pursuant to this paragraph (b) shall be effective only as to the specific source covered by the order and such petition.
(5)(a)(I) Any order issued pursuant to subsection (3) of this section which pertains to an alleged violation described in section 120(a)(2)(A) of the federal act shall also require each person who is subject to such order, within forty-five calendar days after the issuance of such order, to calculate the penalty owed in accordance with paragraph (b) of this subsection (5) and submit the calculation, together with a payment schedule and all information necessary for an independent verification thereof, to the division. If the order has been stayed pursuant to subsection (4) of this section, the penalty calculation shall be submitted by the owner or operator to the division within forty-five calendar days after issuance of a final determination of the commission that:

(A)

A violation or noncompliance occurred;

(B)

If a revision to the state implementation plan has been requested, all or part of such request should be denied; except that, if only part of such request is denied, the penalty calculation shall not be submitted for any aspect of the violation or noncompliance which is excused by reason of approval of a requested revision of the state implementation plan;

(C)

The violation is one described in section 120(a)(2)(A) of the federal act; and

(D)

If an exemption pursuant to subsection (7) of this section has been claimed, the owner or operator is not entitled thereto.

(II)

The division shall review the penalty calculation and schedule submitted pursuant to subparagraph (I) of this paragraph (a) and shall issue an order assessing the noncompliance penalty and providing a payment schedule therefor.

(b)

Intentionally left blank —Ed.

(I)

The amount of the penalty which shall be assessed under this subsection (5) shall be equal to:

(A)

The amount, determined in accordance with section 120 of the federal act and rules and regulations promulgated under said act by the United States environmental protection agency, which shall be no less than the sum of the quarterly equivalent of the capital costs of compliance and debt service over a normal amortization period of not longer than ten years, operation and maintenance costs foregone as a result of noncompliance, and any additional value which a delay in compliance beyond July 1, 1979, may have for the owner or operator of such stationary source; less

(B)

The amount of any expenditure made by the owner or operator of such stationary source during any such quarter for the purpose of bringing the source into, and maintaining compliance with, such requirement to the extent that such expenditure has not been taken into account in the calculation of the penalty under sub-subparagraph (A) of this subparagraph (I).

(II)

To the extent that any expenditure under sub-subparagraph (B) of subparagraph (I) of this paragraph (b) made during any quarter is not subtracted for such quarter from the costs under sub-subparagraph (A) of subparagraph (I) of this paragraph (b), such expenditure may be subtracted for any subsequent quarter from such costs; except that in no event shall the amount paid be less than the quarterly payment minus the amount attributed to the actual cost of construction.

(c)

Any penalty assessed pursuant to subsections (5) to (11) of this section shall be paid in equal quarterly installments (except as provided in sub-subparagraph (B) of subparagraph (I) of paragraph (b) of this subsection (5)) for the period which begins either August 7, 1979, if notice pursuant to subsection (2) of this section is issued on or before such date or which begins on the date of issuance of notice pursuant to subsection (2) of this section if such notice is issued after August 7, 1979, and which period ends on the date on which such stationary source is estimated to come into compliance.

(d)

Any person who fails to pay the amount of any penalty with respect to any stationary source under this subsection (5) on a timely basis shall be required to pay, in addition, a quarterly nonpayment penalty for each quarter during which such failure to pay persists. Such nonpayment penalty shall be in an amount equal to twenty percent of the aggregate amount of such person’s penalties and nonpayment penalties with respect to such stationary source which are unpaid as of the beginning of such quarter.

(6)

Within twenty calendar days after issuance of an order under subparagraph (II) of paragraph (a) of subsection (5) of this section, the owner or operator may file with the commission a written petition requesting a hearing to review such order. Within sixty calendar days after the filing of such petition, the commission shall hold a hearing and issue a decision thereon.

(7)

Intentionally left blank —Ed.

(a)

The owner or operator of any stationary source shall be exempt from the duty to pay a noncompliance penalty pursuant to this section if after notice the owner or operator demonstrates at a hearing that the failure of such stationary source to comply is due solely to:

(I)

The conversion by such stationary source from the burning of petroleum products or natural gas, or both, as the primary energy source to the burning of coal pursuant to an order under section 119 of the federal act;

(II)

In the case of a coal-burning source granted an extension under section 119 of the federal act, a prohibition from using petroleum products or natural gas, or both, by reason of an order under the provisions of section 2 (a) and (b) of the federal “Energy Supply and Environmental Coordination Act of 1974” or under any legislation which amends or supersedes those provisions;

(III)

The use of innovative technology sanctioned by an enforcement order under section 113 (d)(4) of the federal act;

(IV)

An inability to comply with such requirements for which the stationary source has received an order pursuant to section 25-7-118, which inability results from reasons entirely beyond the control of the owner or operator of such stationary source or of any entity controlling, controlled by, or under common control with the owner or operator of such stationary source; or

(V)

The conditions by reason of which a temporary emergency suspension is authorized under section 110 (f) or (g) of the federal act;

(b)

The division may, after notice and opportunity for a public hearing, exempt the owner or operator of any stationary source from the duty to pay a noncompliance penalty pursuant to this section with respect to a particular instance of noncompliance if it finds that the instance of noncompliance is inconsequential in nature and duration. If a public hearing is requested by an interested person, the request must be transmitted to the commission within twenty calendar days after its receipt by the division. The commission shall, within sixty calendar days after its receipt of the request, hold a public hearing, and within thirty calendar days after the hearing, issue its decision.

(c)

An exemption under this subsection (7) shall cease to be effective if the stationary source fails to comply with the interim emission control requirements or schedules of compliance, including increments of progress, under any such extension, order, or suspension.

(8)

If the owner or operator of a stationary source who receives an order pursuant to subsection (5) of this section fails to submit a calculation of the penalty, a schedule for payment, and the information necessary for an independent verification thereof, the division may enter into a contract with a person who has no financial interest in the ownership or operation of the stationary source or in any person controlling, controlled by, or under common control with such stationary source to assist in determining the penalty assessment or payment schedule with respect to such stationary source. The cost of such contract may be added to the penalty to be assessed against the owner or operator of such stationary source.

(9)

Intentionally left blank —Ed.

(a)

The division or the commission may adjust the amount of the penalty assessment or the payment schedule proposed by the owner or operator if the administrator of the United States environmental protection agency determines that the penalty or schedule does not meet the requirements of the federal act.

(b)

Upon making a determination that a stationary source which is subject to a penalty assessment pursuant to this section is in compliance, the division shall review the actual expenditures made by the owner or operator of such stationary source for the purpose of attaining and maintaining compliance and, within one hundred eighty days after such stationary source comes into compliance, shall either provide reimbursement with interest at appropriate prevailing rates for any overpayment by such person or assess and collect any additional payment with interest at prevailing rates for any underpayment by such person.

(10)

Any orders, payments, sanctions, or other requirements under this section shall be in addition to any other orders, payments, sanctions, or other requirements of this article.

(11)

The division or the commission may request the district attorney for the district in which the alleged violation or noncompliance, or any part thereof, occurred or may request the attorney general to bring, and if so requested it is his or her duty to bring, a suit for recovery of any penalty or nonpayment penalty, with interest, imposed pursuant to subsection (5) of this section if the penalty is not paid when due.

Source: Section 25-7-115 — Enforcement - civil actions - definitions, https://leg.­colorado.­gov/sites/default/files/images/olls/crs2023-title-25.­pdf (accessed Oct. 20, 2023).

25‑7‑101
Short title
25‑7‑102
Legislative declaration
25‑7‑103
Definitions
25‑7‑103.5
Air quality enterprise - legislative declaration - fund - definitions - gifts, grants, or donations - rules - report - repeal
25‑7‑104
Air quality control commission created
25‑7‑105
Duties of commission - technical secretary - rules - report - legislative declaration - definitions - repeal
25‑7‑105.1
Federal enforceability
25‑7‑106
Commission - additional authority
25‑7‑106.3
Commission - duties - wood-burning stoves - episodic no-burn days - rules
25‑7‑106.7
Regulations - studies - AIR program area
25‑7‑107
Commission - area classification
25‑7‑108
Commission to promulgate ambient air quality standards
25‑7‑109
Commission to promulgate emission control regulations
25‑7‑109.1
Emergency rule-making
25‑7‑109.2
Small business stationary source technical and environmental compliance assistance program - rules - advisory panel - legislative declaration - repeal
25‑7‑109.3
Colorado hazardous air pollutant control and reduction program - rules - repeal
25‑7‑109.5
Toxic air contaminants - annual toxic emissions reporting program - monitoring program - health-based standards - emission control regulations - air toxics permitting program assessment - rules - definitions
25‑7‑109.6
Accidental release prevention program
25‑7‑110
Commission - procedures to be followed in setting standards and regulations
25‑7‑110.5
Required analysis of proposed air quality rules
25‑7‑110.8
5
25‑7‑111
Administration of air quality control programs - directive - prescribed fire - review
25‑7‑112
Air pollution emergencies endangering public health anywhere in this state
25‑7‑113
Air pollution emergencies endangering public welfare anywhere in this state
25‑7‑114
Permit program - definitions
25‑7‑114.1
Air pollutant emission notices - rules - fees
25‑7‑114.2
Construction permits
25‑7‑114.3
Operating permits required for emission of pollutants
25‑7‑114.4
Permit applications - contents - rules - definitions
25‑7‑114.5
Application review - public participation
25‑7‑114.6
Emission notice - fees
25‑7‑114.7
Emission fees - fund - rules - definition
25‑7‑115
Enforcement - civil actions - definitions
25‑7‑117
State implementation plan - revisions of limited applicability
25‑7‑118
Delayed compliance orders
25‑7‑119
Hearings
25‑7‑120
Judicial review
25‑7‑121
Injunctions
25‑7‑122
Civil penalties - rules - definitions
25‑7‑122.1
Criminal penalties
25‑7‑122.5
Enforcement of chlorofluorocarbon regulations
25‑7‑122.6
Administrative and judicial stays
25‑7‑123
Open burning - penalties
25‑7‑123.1
Statute of limitations - penalty assessment - criteria
25‑7‑124
Relationship with federal government, regional agencies, and other states
25‑7‑125
Organization within department of public health and environment
25‑7‑126
Application of article
25‑7‑127
Continuance of existing rules and orders
25‑7‑128
Local government - authority - penalty
25‑7‑129
Disposition of fines - community impact cash fund - repeal
25‑7‑130
Motor vehicle emission control studies
25‑7‑131
Training programs - emission controls
25‑7‑132
Emission data - public availability - submission of 2023 reports to state auditor - definitions - repeal
25‑7‑133
Legislative review and approval of state implementation plans and rules - legislative declaration - definition
25‑7‑133.5
Approval or rescission of specific revisions to state implementation plan (SIP) after 1996
25‑7‑135
Ozone protection fund created
25‑7‑137
Requirements for legislative approval of Grand Canyon visibility transport commission or successor body advisory recommendations, reports, and interpretations
25‑7‑138
Housed commercial swine feeding operations - waste impoundments - odor emissions - fund created
25‑7‑139
Methyl tertiary butyl ether - prohibition - phase-out - civil penalty
25‑7‑140
Greenhouse gas emissions - data collection - legislative declaration - rules - reporting - forecasting - public information - definitions
25‑7‑141
Air toxics - duties of covered entities - public notice of air quality incidents - monitoring - corrective action - legislative declaration - definitions - rules
25‑7‑142
Energy benchmarking - data collection and access - utility requirements - task force - rules - reports - definitions - legislative declaration - repeal
25‑7‑143
Emergency stationary engine exception - legislative declaration - rules - notice to revisor - repeal
25‑7‑144
Tampering with motor vehicle emission control systems - violations - exceptions - rules - reporting - definitions
25‑7‑145
Legislative interim committee on ozone air quality - created - members - repeal
25‑7‑201
Prevention of significant deterioration program
25‑7‑203
State implementation plan - contents
25‑7‑204
Exclusions
25‑7‑205
Innovative technology - waivers
25‑7‑206
Procedure - permits
25‑7‑208
Area designations
25‑7‑209
Colorado designated pristine areas for sulfur dioxide
25‑7‑210
Applicability
25‑7‑211
Visibility impairment attribution studies
25‑7‑212
Actions of federal government affecting visibility - evaluation report
25‑7‑301
Attainment program
25‑7‑302
State implementation plan - contents
25‑7‑304
Emission reduction offsets
25‑7‑305
Alternative emission reduction
25‑7‑401
Legislative declaration
25‑7‑402
Definitions
25‑7‑403
Commission - rule-making for wood-burning stoves
25‑7‑404
Wood stove testing program established
25‑7‑405
Certification required for sale
25‑7‑405.5
Resale of used noncertified wood-burning devices - prohibited
25‑7‑406
Fireplace design program
25‑7‑407
Commission - rule-making for fireplaces
25‑7‑408
Required compliance in building codes
25‑7‑409
Voluntary no-burn days
25‑7‑410
Applicability
25‑7‑411
Legislative declaration
25‑7‑412
Definitions
25‑7‑413
Methods for reducing wood smoke in program area
25‑7‑501
Legislative declaration
25‑7‑502
Definitions
25‑7‑503
Powers and duties of commission - rules - delegation of authority to division
25‑7‑504
Asbestos abatement project requirements - certificate to perform asbestos abatement - certified trained persons
25‑7‑505
Certificate to perform asbestos abatement - application - approval by division - suspension or revocation of certificate
25‑7‑505.5
Testing for certification under part 5
25‑7‑506
Certificate of trained supervisors - application - approval by division - rules - responsibilities of trained supervisors - renewal of certificate
25‑7‑506.5
Certification of air monitoring specialist - rules
25‑7‑507
Certification required under federal law for asbestos projects in facilities
25‑7‑507.5
Renewal of certificates - rules - recertification
25‑7‑508
Grounds for disciplinary action - letters of admonition - denial of certification - suspension, revocation, or refusal to renew - requirement for corrective education - administrative fines
25‑7‑509
Prohibition against local certification regarding asbestos abatement
25‑7‑509.5
Building permits
25‑7‑510
Fees
25‑7‑511
Enforcement
25‑7‑511.5
Injunctive proceedings
25‑7‑511.6
Refresher training - authorization
25‑7‑512
Repeal of part
25‑7‑901
Legislative declaration
25‑7‑902
Definitions
25‑7‑903
Clean air transit options for state employees
25‑7‑1001
Legislative declaration
25‑7‑1002
Air quality related values program
25‑7‑1003
Definitions
25‑7‑1004
Administration of program by division
25‑7‑1005
Verification of federal land manager’s assertion of air quality related value impairment
25‑7‑1006
Source attribution and control strategy development
25‑7‑1007
Commission to consider control strategies in rule-making proceeding
25‑7‑1008
Voluntary agreements
25‑7‑1101
Legislative declaration
25‑7‑1102
Definitions
25‑7‑1103
Powers and duties of air quality control commission - rules
25‑7‑1104
Duties of air pollution control division - certification of trained individuals
25‑7‑1105
Fees
25‑7‑1106
Enforcement
25‑7‑1107
Applicability of article - child-occupied facilities and target housing
25‑7‑1201
Legislative declaration
25‑7‑1202
Definitions
25‑7‑1203
Voluntary agreements
25‑7‑1204
Regulatory assurances
25‑7‑1205
Exceptions
25‑7‑1206
Coal-fired power plants
25‑7‑1207
Allowances
25‑7‑1208
Economic or cost-effectiveness analyses not required
25‑7‑1301
Legislative declaration
25‑7‑1302
Definitions
25‑7‑1303
Southern Ute Indian tribe/state of Colorado environmental commission created
25‑7‑1304
Commission - powers and duties - rules
25‑7‑1305
Administration of reservation air program
25‑7‑1306
Agencies of state to cooperate
25‑7‑1307
Funding for staff and program costs
25‑7‑1308
Administrative and judicial review of commission actions
25‑7‑1309
Repeal of part
25‑7‑1401
Legislative declaration
25‑7‑1402
Definitions
25‑7‑1403
Electrifying school buses grant program - creation - eligibility
25‑7‑1404
Reporting
25‑7‑1405
Electrifying school buses grant program cash fund - creation - gifts, grants, and donations - transfer
25‑7‑1406
Repeal of part
25‑7‑1501
Legislative declaration
25‑7‑1502
Definitions
25‑7‑1503
Scope and applicability
25‑7‑1504
Emission standards for new products
25‑7‑1505
Testing - required displays - demonstrations of compliance
25‑7‑1506
Rules - analysis
25‑7‑1507
Enforcement - verifications of compliance - civil action by attorney general - penalties
Green check means up to date. Up to date

Current through Fall 2024

§ 25-7-115’s source at colorado​.gov